BRIDGES
WYONG SHIRE, NSW
Steelworks Engineering fabricated and installed 3 off shared pathway bridges for Wyong Shire Council. The bridges ranged in length from 7.5m to 13m. Steelworks Engineering also designed and installed all of the concrete foundations for these bridges.